HVAC installation for businesses in Sabadell
HVAC installation and renewal in former textile buildings, industrial units with offices, logistics buildings and town-centre premises in Sabadell, sized for the Vallès climate.
Installing HVAC in Sabadell often means adapting to a building that was never designed for it: a converted former textile building, a logistics unit that is gaining offices, or premises on the ground floor of a residential block in the town centre. This page is for owners, companies refurbishing their premises and technical managers planning a new installation or the renewal of an existing system in the town. The general method is explained on the HVAC installation for buildings service page; here we focus on what shapes the project in Sabadell.
Former textile buildings: volume, structure and routes
Mills and industrial buildings from the textile era tend to have high ceilings, sawtooth roofs, thick masonry walls and, often, cast-iron columns. Three aspects are studied before conditioning them:
- Stratification. In tall volumes warm air stays at the top, so air distribution and supply height matter as much as the equipment's capacity.
- Roof loading. Before outdoor units are positioned, we check what the structure can take and whether they are better placed in a courtyard or at ground level.
- Routes. Pipework and ducts have to coexist with the existing structure; if the building has any level of heritage protection, the owner confirms which restrictions apply to façades and roofs.
Zoned solutions such as VRF or fan-coil systems allow an open-plan floor and enclosed rooms in the same building to be treated differently.
Offices inside industrial and logistics units
On industrial estates it is common to add offices, changing rooms or control rooms inside an existing unit. These are small enclosures next to a large unconditioned volume, with loading bay doors opening frequently. They should be well insulated, given equipment and controls independent of the rest of the unit, and checked against the available electrical capacity, because the supply already feeds machinery, forklift chargers or cold rooms. MRS also carries out the electrical installation and panels, so new circuits and protection devices are part of the same project rather than depending on another contractor.
Sizing for the Vallès climate
Sabadell has hot summers and colder winters than the coast. A unit chosen on cooling load alone can fall short on heating early on a January morning, after the building has been unheated overnight. The proposal therefore calculates both demands separately. Where aerothermal heat pumps are considered, their performance at low outdoor temperatures is checked, and outdoor units are positioned so that defrost water does not freeze on walkways.
Town-centre premises: courtyards, shared roofs and neighbours
Shops and offices in the town centre usually occupy ground floors or upper floors of residential buildings. There, the installation depends on where outdoor units can go, how pipework can rise through the building and how much noise reaches the flats. Before work starts, the residents' association must agree where shared elements are used, and equipment deliveries have to be planned around streets with restricted loading hours. For office use, the office HVAC maintenance page covers the specific needs of that sector.
Phased works with materials prepared in Sabadell
When the building stays in use, the works are divided into phases. The materials for each phase are prepared and grouped at the MRS production and warehouse base on Carrer de Ramon Llull, in the town itself, so each day starts with what is needed and the works take up less space on site. Tasks that require operations to stop can be scheduled at night or out of hours, arranged in advance. On completion, each unit is labelled and documented, ready to be added to an HVAC maintenance contract in Sabadell.
Related content
Frequently asked questions
Can a former textile mill be air-conditioned without filling it with exposed ductwork?
It depends on the use and the structure. Open-plan spaces can combine a few long-throw supply points with low-level returns, while partitioned areas can have indoor units room by room. If the ceiling or roof structure is a feature to keep visible, pipe and duct routes are studied during diagnosis so they work with the existing structure.
Does the roof of an industrial unit need strengthening for the outdoor units?
Not always, but it has to be checked. Many lightweight metal roofs are not designed for point loads. Before the location is decided, we review what the structure can take and consider alternatives such as ground-level plinths or an area of roof bearing directly on columns. The choice also affects access for maintenance.
Can you air-condition just the offices of a logistics unit and leave the warehouse unconditioned?
Yes, and it is the most common approach. The offices are treated as a separate enclosure with their own equipment and controls, and the separation from the warehouse is designed so that loading bay doors and draughts in the unit do not affect comfort. If part of the warehouse may be conditioned later, electrical capacity and routes should be allowed for now.
What permissions does a town-centre shop need to install an outdoor unit?
If the unit goes on the roof, the façade or a shared courtyard, the residents' association has to agree and, depending on the work, a municipal notification or licence may be needed, which is worth confirming with the town council before work starts. The technical proposal states the intended location so you can apply with the right information.
Can the installation be timed for the company's quietest period?
Yes, and it is advisable when the work affects production or the building's main HVAC. For it to fit, the diagnostic visit and the proposal need to happen early enough to prepare equipment and materials. Tasks that require operations to stop can also be scheduled at night or out of hours, arranged in advance.
Let us plan your Sabadell installation
Tell us the type of building, how each area is used and any constraints on the works, so we can prepare the diagnostic visit.
Request a technical assessment